
Construction to start on the third section of the Trans-Balkan Corridor
Serbia’s power transmission operator (EMS) has signed a contract with Serbian engineering company Kodar Energomontaža for constructing a two-system, 400-kilovolt (kV) transmission line from Obrenovac to Bajina Basta, part of the third phase of the Trans- …